Home / Toilet Partitions / Pedestal Mount - Overhead Braced (POB) / BHP Olympic Dam Surface Change Facility

BHP Olympic Dam Surface Change Facility

BHP Group owns and operates the Olympic Dam mine in remote South Australia which has one of the world’s most significant deposits of copper, uranium, gold and silver precious metals.

BHP constructed a 4,000m2 Surface Change Facility where over 4000 workers can shower and change before and after their shift. Daily flights to and from Adelaide transport FIFO workers and the adjacent Olympic Dam mining centre and Roxby Downs township service the mine and house its workforce.

BHP Olympic Dam Surface Change Facility
Project Brief

Supply robust toilet and shower partitioning system that is easy to clean with a hose and prevents water traps.

Duracube Solution

Duracube® provided a one stage delivery and installation service to the remote location.

Connect with our team to help craft your next wet-area project.

Get in Touch

Colours & Materials
Durasafe 268 Evening - Deep and sophisticated grey for elegant partition designs

268 Evening

5427 Refresh Oak

Duracube Products Installed
Pedestal Mount – Overhead Braced (POB)

Pedestal Mount – Overhead Braced (POB)

Privacy Panel – Full Height (PFH)

Privacy Panel – Full Height (PFH)

Privacy Panel – Post Fixed (PPF)

Privacy Panel – Post Fixed (PPF)

Product Details

Builder: Ahrens Group Pty Ltd

Architect: Into Architects
Download Project Spotlight: https://duracube.com.au/wp-content/uploads/2023/12/duracube-project-spotlight_bhp-olympic-dam-scf.pdf
Location: Olympic Way, Olympic Dam SA 5725

Thanks for your interest in our products, please submit your email address to gain access to all of our downloadable files.

Hickeys Lane Sports GroundBeaudesert State High School QLD