Sutherland Hospital

Sutherland Hospital

Hindmarsh Constructions contacted Duracube® to supply quality partitioning and locker systems suitable for the new Sutherland Hospital Operating Theatre Complex.

The refurbishment work was constructed in a highly sensitive location while the existing theatres were operational.

The Duracube® team produced and assembled 252 custom designed L Door Plinth Mounted Lockers with ventilation slot and electronic lock as well as 7.7 lineal metres of bench seating constructed from Durasafe® compact laminate.

Project Brief:

Supply quality partitioning and locker systems suitable for healthcare environment.

Duracube Solution:

Duracube® provided Floor Mount Overhead Braced (FOB) partitioning system and custom designed Plinth Mounted Lockers with L Door and custom designed bench seating. A flexible delivery and installation service was provided to align with live healthcare environment and staged program.

Duracube Products Installed:

Floor Mount – Overhead Braced (FOB)

Floor Mount – Overhead Braced (FOB)

Privacy Panel - Pedestal Mount (PPM)

Privacy Panel – Pedestal Mount (PPM)

Lockers – Plinth Mounted (LPM)

Lockers – Plinth Mounted (LPM)

Bench Seating - Island (BSI)

Bench Seating – Island (BSI)

Durasafe Colours:

738 Oak

Builder:

Hindmarsh Constructions

Architect:

NBRS Architecture