BHP Olympic Dam Surface Change Facility
A 4,000m² surface change facility in remote South Australia where more than 4,000 workers shower and change each shift. The brief called for partitioning that could be hosed down and left no water traps. Working with Ahrens Group and Into Architects, DuraCube supplied Pedestal Mount Overhead Braced partitions with full-height and post-fixed privacy panels — delivered and installed in a single stage to a site hours from the nearest city.
View project